Nová DubnicaElectronics since 1992
References

Power electronics · March 2025

Power-factor correction for a small hydro plant

Nosice small hydro plant, Nosice, Slovakia

With the new compensation switchboard the power factor is 0.98–0.99.

Power-factor correction for a small hydro plant

Project

01

How we did it

We added a compensation switchboard to the Nosice small hydro plant to optimise its power factor. At the turbine’s full output of about 300 kW, the power factor now sits between 0.98 and 0.99.

Photos

02

From the project

Have a project on the table?

A similar project?

Send us your brief or call — a sales engineer or technician from the right division will get back to you.

Call Send an enquiry