For the sugar factory in Sereď we built, installed and commissioned two switchboards providing the 110 V DC backed-up supply for the substation control circuits.
References
Power electronics · September 2024
110 V DC backed-up supply for a substation
Sereď sugar factory, Sereď, Slovakia
Manufacture, installation and start-up of two battery switchboards.
Project
01
How we did it