Power electronics · September 2024

110 V DC backed-up supply for a substation

Sereď sugar factory, Sereď, Slovakia

Manufacture, installation and start-up of two battery switchboards.

110 V DC backed-up supply for a substation

Project

01

How we did it

For the sugar factory in Sereď we built, installed and commissioned two switchboards providing the 110 V DC backed-up supply for the substation control circuits.